Founding Ceremony Main Stage Structure: Breakdown of Truss Setup and Red Carpet Layout

Founding Ceremony Main Stage Structure: Breakdown of Truss Setup and Red Carpet Layout

Event Type: Groundbreaking Ceremony Main Stage – Truss Stage with Brand Backdrop Theme: Zhongjun World City Central Construction Kickoff (Backdrop design as shown in the attached image) Production Details: Truss Assembly · UV-Printed Backdrop · Red Carpet Layout Visual Highlights: Dominant red theme running through the central axis, covering the stage, seating area, and foundation...

标识类型: 奠基仪式主景 · 桁架舞台与喷绘背板

品牌主题: 中骏世界城集中开工场景(背板项目标识见配图)

制作工艺: 桁架组立 · UV喷绘背板 · 红毯排布

画面亮点: 红色主调贯穿轴线,舞台、座席与奠基区逐级递进

先看地面承载

奠基仪式多设在工地空地,地面高差大、风向难控。我到场勘验习惯先验承载与平整:素土压实地面要在桁架底座下垫钢板,混凝土面留意管线井盖位置。主景结构以方通铝合金桁架为主,舞台架、灯光架与背板架共用一套规格,插销与底座通用,进场才能快。桁架分段运输、逐段组对,斜撑在中跨补一道防晃;背板四角必须与架体绑牢,配重或膨胀螺栓按抗风计算布置,不能目测。

画面喷印与绷面

背板画面用喷绘布或UV喷绘硬板两种做法:大幅面分幅喷印,接缝留十公分重叠,从背面绕上桁架用扎带收紧,正面以拉紧器绷平,避免鼓皱。工期紧的场次,画面在工厂打样确认色号再发往现场。两张配图分别呈现舞台桁架立柱与红色顶棚的组立状态、以及开工场地的拱门与座席排布,奠基区沙堆、盖红绸的石碑与系花铁锹清晰可辨,可作主景结构参照。

红毯动线与防滑

红毯从入口拱门经座席区直上舞台台阶,主轴线一整条通铺不断缝,两侧分幅接缝裁齐。毯面拼接用双面胶加铝压条收边,坡道段垫防滑底衬;重庆雨季毯面遇水发滑,备防雨布与提示牌。座椅按方阵排布、留双侧通道,通道宽度按两人并行校核,礼仪动线提前彩排走一遍。椅套与缎带色系统一,椅背按排号图对位,签到台与指引牌落在动线起点。

供电与用电

主景用电两路来源:现场配电箱或临时发电机。舞台灯光与屏幕电源分回路,二级箱装漏保;线缆跨道走线槽盖板压覆,不允许裸线拖地。背板投光灯线路沿桁架整理绑扎,通电试灯放在仪式前一小时完成,备用回路同位待命。

收尾与材料回流

撤场倒序进行:先收电器与小型物料,再松画面、降桁架,末尾收地毯归仓。桁架插销按箱清点防丢件,喷绘布擦净卷装入库,为下一场复用留底。合川标识标牌团队承接活动物料时,把主景结构、画面与动线三段写进同一份排期表,责任到人,节点到天。

重庆要做门头招牌、导视灯箱,欢迎带店面照片来聊。



Related Articles

See other articles in the same category to compare material selections and construction methods.

View all articles
Layout of storefront signage and fascia components on-site

On-site layout for store signage and fascia components

When renovating overhead signage that involves high-altitude work, the most critical step is layout. If the lines are off by even one centimeter, the entire sign panel will be misaligned, forcing compromises downstream. On our first day, before removing any old structures, we use a laser level to measure and record the verticality of every eave line and each column in a logbook. We also document the deviations of the existing sign for archival purposes. This logbook later became

Complete replacement and numbering cross-reference of building signage for the industrial park

Complete replacement and numbering reconciliation of building signage in the industrial park

Replacing a single building sign in an older park is easy; sourcing a matching one is hard. The original panels are discontinued, the color can't be matched, and the font type is no longer in use. When we take on such projects, our first step isn't cutting material—it's mapping the entire numbering system: which development phases, how many font sets, and when production stopped. We only proceed once the records align.

Outdoor billboard panel refresh and tensioning

Outdoor billboard panel refurbishment and tensioning

The main entrance sign of our R&D and production base: from afar, it reflects the factory's appearance; up close, it showcases craftsmanship. The steel frame is sound, but the printed graphics fail first—fading, wrinkling, and peeling at the corners, flapping loudly in the wind. For such renewals, we separate structural inspection from graphic replacement into two distinct scopes, executed sequentially rather than bundled. What the client wants is a

Batch update of storefront signage for fresh food retail chains

Bulk storefront updates for chain fresh food stores

It's easy to rebrand a single storefront, but doing it across dozens of locations is hard. The challenge isn't craftsmanship—it's consistency: the same brand message often gets altered in font and color across different cities. Before we can unify them with a fresh look, we first need to reconcile these variations. For chain-wide projects, our first deliverable isn't a design mockup.

Yu ICP Be 18012268 No. -2